|
|
#1 (permalink) |
|
Class Clown
Join Date: Feb 2003
Location: Winnipeg, Canada
Posts: 9,675
|
Perhaps sctx, or someone else who has had dealings with the bureaucrats, would care to comment on the accuracy of these definitions.
Government Contract Dictionary CONTRACTOR: A gambler who never gets to shuffle, cut, or deal. BID OPENING: A poker game in which the losing hand wins. BID: A wild guess carried out to two decimal places. LOW BIDDER: A contractor who is wondering what the Hell he left out of his bid. ENGINEER’S ESTIMATE: The cost of construction in Heaven. PROJECT MANAGER: The conductor of an orchestra in which every musician is in a different union. CRITICAL PATH METHOD: A management technique for losing your shirt under complete control. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION: A protective coating made by half-baking a mixture of fine print, red tape, split hairs, and baloney -usually applied at random with a shotgun. STRIKE: An effort to increase egg production by strangling the chicken. DELAYED PAYMENT: A tourniquet applied at the pockets. COMPLETION DATE: The point at which liquidating damages begin. LIQUIDATING DAMAGES: A penalty for failing to achieve the impossible. AUDITOR: People who go in after the war is lost and bayonet the wounded. LAWYER: People who go in after the auditors are finished and strip the bodies. |
|
|
|
| register to remove these adverts | |
![]() |
| Thread Tools | |
|
|
home | forum | multiMedia | read more | directory | trip planning | real estate