Construction Regulations

What are the current construction regulations with respect to the maximum height that a building can be built? Also, what department at the Municipal government in Playa looks after these requirements and processes the development permits? Thanks!!
northplaya is offline   Reply With Quote
Old 12-31-2017   #2 (permalink)
life=playa
 
DrewJones's Avatar
 
Join Date: May 2015
Location: Playa del Carmen
Posts: 854
Quote:
Originally Posted by northplaya View Post
What are the current construction regulations with respect to the maximum height that a building can be built? Also, what department at the Municipal government in Playa looks after these requirements and processes the development permits? Thanks!!

Depends on the zoning of the specific property and your willingness to pay "extra fees", but 16 meters is the official max.


You will need to hire a "perito" that is an engineer that works on behalf of the city but isn't actually a city employee. (I think, I could be wrong) He is the one who makes the judgement calls on specifics.
DrewJones is offline   Reply With Quote
Old 12-31-2017   #3 (permalink)
añejo
 
Babaloo's Avatar
 
Join Date: Apr 2004
Location: Playa del Carmen
Posts: 29,986
Quote:
Originally Posted by DrewJones View Post
Depends on the zoning of the specific property and your willingness to pay "extra fees", but 16 meters is the official max.
Sort of.
13 meters not including facade around rooftop utilities.
Enforced?
Look around town
Babaloo is offline   Reply With Quote
Old 12-31-2017   #4 (permalink)
añejo
 
rainmaker's Avatar
 
Join Date: Nov 2006
Location: Calgary and Playa
Posts: 2,365
Send a message via Skype™ to rainmaker
Quote:
Originally Posted by Babaloo View Post
Sort of.
13 meters not including facade around rooftop utilities.
Enforced?
Look around town
Its actually 13.5 meters plus the roof top stuff and is measured from the highest elevation of building which allows for 4 floors of condos plus main floor retail, so, if there is a slope on the property, you may see the 4 floors from the front and 5 floors from the back..ie: The Hyatt
rainmaker is offline   Reply With Quote
Old 12-31-2017   #5 (permalink)
añejo
 
Babaloo's Avatar
 
Join Date: Apr 2004
Location: Playa del Carmen
Posts: 29,986
Quote:
Originally Posted by rainmaker View Post
Its actually 13.5 meters plus the roof top stuff and is measured from the highest elevation of building which allows for 4 floors of condos plus main floor retail, so, if there is a slope on the property, you may see the 4 floors from the front and 5 floors from the back..ie: The Hyatt
The building height restriction has been abused all over town.
Babaloo is offline   Reply With Quote
Old 12-31-2017   #6 (permalink)
añejo
 
rainmaker's Avatar
 
Join Date: Nov 2006
Location: Calgary and Playa
Posts: 2,365
Send a message via Skype™ to rainmaker
Quote:
Originally Posted by Babaloo View Post
The building height restriction has been abused all over town.
Agreed
rainmaker is offline   Reply With Quote
Old 12-31-2017   #7 (permalink)
way into it
 
Join Date: Feb 2011
Location: Calgary, Alberta
Posts: 155
Thanks for all the input on the quagmire of regulations. Sounds a bit like a horror story. Does anyone know which department at the Municipal Government (or wherever) gives out the development permits for any building construction in Playa? Thanks again!!
northplaya is offline   Reply With Quote
Old 12-31-2017   #8 (permalink)
life=playa
 
DrewJones's Avatar
 
Join Date: May 2015
Location: Playa del Carmen
Posts: 854
Quote:
Originally Posted by northplaya View Post
Thanks for all the input on the quagmire of regulations. Sounds a bit like a horror story. Does anyone know which department at the Municipal Government (or wherever) gives out the development permits for any building construction in Playa? Thanks again!!

I'm not sure how to describe the specific office, though if I remember correctly, if you're standing in the plaza looking at the building, I believe it's on the right hand side. The Municipal Palace building isn't too big, so it shouldn't be too hard to find. Problem is you won't really find anyone who will answer questions, as they'll just tell you to ask your architect and perito, or give you very basic info. (which is info your architect and perito should know anyway)


The city wouldn't answer any questions for me until I had official plans 100% complete and signed off by the perito. We applied for, and received 16m with no problem or bribes, which is what the perito told me was the max. The process from plan submission to breaking ground was about 5 months for me, though I applied while government was transitioning. There were a few times where I'm sure I could have sped things along with a bribe, but I declined.


Good luck and send me a PM if you want to go over any specific details.
DrewJones is offline   Reply With Quote
Old 12-31-2017   #9 (permalink)
¡No mames güey!
 
roni's Avatar
 
Join Date: Feb 2003
Location: Mérida, Yucatán
Posts: 77,961
Have your architect interact with the permit process.
roni is offline   Reply With Quote
Old 01-01-2018   #10 (permalink)
añejo
 
CalifGuy's Avatar
 
Join Date: Sep 2003
Location: Nor Cal
Posts: 5,432
Quote:
Originally Posted by DrewJones View Post

The city wouldn't answer any questions for me until I had official plans 100% complete and signed off by the perito. We applied for, and received 16m with no problem or bribes, which is what the perito told me was the max. The process from plan submission to breaking ground was about 5 months for me, though I applied while government was transitioning. There were a few times where I'm sure I could have sped things along with a bribe, but I declined.

Good luck and send me a PM if you want to go over any specific details.
16m, what the hell are you building?
CalifGuy is offline   Reply With Quote
Old 01-02-2018   #11 (permalink)
beachaholic
Merchant
 
Top Mexico Real Estate's Avatar
 
Join Date: Mar 2009
Location: Playa del Carmen, Mexico
Posts: 397
Send a message via ICQ to Top Mexico Real Estate Send a message via Skype™ to Top Mexico Real Estate
Quote:
Originally Posted by northplaya View Post
Thanks for all the input on the quagmire of regulations. Sounds a bit like a horror story. Does anyone know which department at the Municipal Government (or wherever) gives out the development permits for any building construction in Playa? Thanks again!!
The Government Entity responsible for building regulations is called Desarrollo Urbano The director´s Name is William S Conrado and here is their contact information and site Dirección General de Infraestructura, Desarrollo Urbano y Medio Ambiente
Top Mexico Real Estate is offline   Reply With Quote
Old 01-03-2018   #12 (permalink)
way into it
 
Join Date: Feb 2011
Location: Calgary, Alberta
Posts: 155
Quote:
Originally Posted by Top Mexico Real Estate View Post
The Government Entity responsible for building regulations is called Desarrollo Urbano The director´s Name is William S Conrado and here is their contact information and site Dirección General de Infraestructura, Desarrollo Urbano y Medio Ambiente

Thanks so much for this info!
northplaya is offline   Reply With Quote
Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


All times are GMT -5. The time now is 04:08 PM.


Powered by: vBulletin
Copyright ©2000 - 2018, Jelsoft Enterprises Ltd.